详细信息
湘潭河西污水处理厂设计总规模为30万m3/d。为了确保处理效果,第二期扩建工程采用氧化沟(A/A/C)处理工艺。
该工程于2010年10月20日开工,设备于2011年8月中旬开始安装 ,于2011年底竣工。湘潭市河西污水处理厂的日处理能力由原来的10万吨提高到15万吨。污水排放达到国家“十二五”规划一级A类排放标准,湘潭市区河西污水处理率达到90%以上。
married men and affairs husband cheat married men who cheat with men
married men and affairs husband cheat married men who cheat with men
why married men cheat on their wives how can people cheat what makes husbands cheat
online affair infidelity signs link
women cheat husband why women cheat on men they love read here
open redirect percentage of women who cheat
wives cheat infidelity in marriage redirect
married cheat when married men cheat looking for affair
marriage affairs women cheat husband I cheated on my husband
my wife cheated on me with my father cheat husband why do husbands cheat
why do husbands cheat cheat on my wife unfaithful wife
read here types of women who cheat wifes that cheat
natural abortion pill click here where to get abortion pills